Dynamic Pallet Gravity Flow Rack Warehouse Steel Live Storage

Customization: Available
Usage: Warehouse Rack
Material: Steel

Product Description

  • Overview
  • Product Description
  • Product Components
  • Product Parameters
  • Product Advantages
  • Factory Production
  • RFQ Documents
  • Packing and Delivery
  • Certificates

Basic Info.

Model NO.PL 90
StructureRack
TypeGravity Rack
MobilityFixed
Height2-9m
Weight150-1500kg
ClosedClosed
DevelopmentNew Type
Serviceabilityfor Special Purpose
Slope of Roller Bedwith 3-5°
Roller Diameter60mm
Load Per Roller150kg/Roller
FinishGalvanized
Transport PackagePacked in Standard Pallets and Wrapped with Films
Specificationtailor made
HS Code73089000
Production Capacity5000 Tons Per Year

Product Description

Dynamic Pallet Gravity Flow Rack Warehouse Steel Live Storage

Dynamic Storage Pallet Gravity Flow Rack is a storage system that Gravity roller lanes ranged side by side and one above the others on the racks. Pallets are loaded from the upper end of the slope (with 3-5° ) and travel through the roller to the lower end picking face. It's the best FIFO storage system and is suitable for mass volume and lesser SKU products. The space utilization is high.

Dynamic Pallet Gravity Flow Rack Warehouse Steel Live Storage

Product Components

Dynamic Storage Pallet Gravity Flow Rack is composed of frames, beams and roller bed. The roller bed consists of a set of rollers designed to fit into a frame structure and mounted on the loading beams. To avoid the fast sliding down of pallets, normally brake rollers are designed. There is also one set of pallet separator for picking the first pallet. The system is designed for the storage of first in first out operation.

Pallet Separators
Pallet Separators
Unpowered roller features
Unpowered Roller System

Unpowered Roller Features:

  • Standard 300/1800 rollers
  • Loading of roller: 50-300kg/pcs
  • Maintenance free
  • Bearings: Sturdy and Durable
  • Waterproof, dust free
  • Long life span

Roller Loading Chart:

Roller Loading Chart

The finish of all painted parts is an Epoxy-powder coating polymerized at 180 °C. The standard colors are RAL 5015 (= sky blue) for the frames and RAL 2004 (=pure orange) for the beams. Roller beds are normally galvanized. Special colors are available on request.

Product Parameters

Model NO. FR 90 Material Steel Q235B
Roller Diameter 60 mm Load per roller 150kg/roller
Pallet separator Yes Payment Terms T/T, L/C
Delivery deadline 3-4 weeks Certificate ISO 9001
Type Flow Rack system HS Code 73089000
Usage Warehouse Rack Finish treatment Powder Coated
Slope of Roller bed 2.5--4 degree Loading Capacity 500kg-1500kg
MOQ 1 20' container Packaging Packed on Pallets and wrapped with Films

Product Advantages

  • Complies with international norms and regulations
  • Offer compact storage, the space utilization rate can be up to 60-70%.
  • First in first out (FIFO) operation.
  • The design is suitable for different size of pallets.
  • High quality of finish.
Gravity Flow Rack Advantages

Factory Production

Factory Production Line 1
Factory Production Line 2

RFQ Documents

Before you send us your Requirement For Quotation, please prepare the following information:

  1. Warehouse layout CAD drawings if available.
  2. Pallet size, entry side, width, depth, height of goods. specially the underneath structure of the pallets. We suggest better to have a sample of pallets for testing of sliding on rollers.
  3. Loading weight per pallet.
  4. Clear height of the warehouse.
  5. Your forklift information, working aisles width and max. reaching height.
  6. Your intra logistic flow within the warehouse.

Packaging and Delivery

1) Packaging details: Standard export package. Long profiles are packed in bundles on plywood or steel pallets, and covered by plastic films. Between each package, air bags are also filled if necessary. For the thinner material such as steel decking, Edge protectors are applied. The small accessories and fasteners are packed inside of the carton boxes and fixed on pallets.

2) Delivery time: For the standard products, Our delivery time is 3 weeks after receipt of the 30% deposit. Other special application of racks can be delivered within 4-5 weeks.

Packaging and Delivery

Certificates

CE Certificate
CE CERTIFICATE
ISO 9001
ISO 9001
ISO 14001
ISO 14001
Trademark Certificate
TRADEMARK CERTIFICATE
Patent Certificate 1
PATENT CERTIFICATE 1
Patent Certificate 2
PATENT CERTIFICATE 2
Software Copyrights 1
SOFTWARE COPYRIGHTS 1
Software Copyrights 2
SOFTWARE COPYRIGHTS 2

Frequently Asked Questions (FAQ)

Q: How does a Dynamic Pallet Gravity Flow Rack work?
Pallets are loaded from the higher end of a sloped roller bed (typically 3-5° slope) and slide down by gravity toward the lower picking face. It is an optimal system for First-In, First-Out (FIFO) warehousing.
Q: What is the loading capacity of this racking system?
The overall system handles a loading capacity ranging from 500kg to 1500kg per pallet. Each individual roller supports a loading limit between 50kg and 300kg, with standard configurations set at 150kg per roller.
Q: What quality and safety certifications does the racking system hold?
The systems conform to strict safety regulations and hold international certifications, including CE, ISO 9001, and ISO 14001 compliance.
Q: What information is required to get an accurate quotation?
Please prepare the warehouse layout CAD drawings, exact pallet size (including entry side, height, depth, and underneath structure), weight per load, warehouse clear height, and forklift specifications.
Q: What are the standard delivery times and MOQ?
The MOQ is one 20-foot container. Standard products are delivered within 3 weeks of deposit receipt, whereas custom or specialized systems generally take between 4 to 5 weeks.

Related Products